APQP?T"穎?doc)

  文件類別:管理表格

  文件格式:文件格式

  文件大?。?3K

  下載次數(shù):125

  所需積分:2點

  解壓密碼:qg68.cn

  下載地址:[下載地址]

清華大學卓越生產運營總監(jiān)高級研修班

綜合能力考核表詳細內容

APQP?T"穎?doc)
APQP Kick-Off Meeting APQP啟動會議 The purpose of this meeting is to develop a common understanding concerning the total requirements of the part/material by assuring that proper communication and buy-in occurs between GM and the supplier. This form encompasses questions from the AIAG Advanced Product Quality Planning and GM APQP Manual GM-1927 manuals. Its intent is to ensure advanced product quality planning activities occur at the appropriate time and establish customer requirements for part qualification, part availability, quality, packaging, scheduling, and tooling information. Current revisions of all GM documents listed can be found in the GM Supply Power web site. 本次會議旨在建立雙方在對零件、材料的所有要求方面的一致理解。下表包含了AIA G產品質量先期策劃和通用APQP手冊GM-1927的問題。其目的在于確保先期 質量策劃活動按進度展開,并明確顧客關于零件認可,零件獲取,質量,包裝,計劃和 工裝方面的信息。GM相關文件的當前版本可在GM Supply Power網(wǎng)站上獲得。 This document should be completed by the supplier and provided to the SQE prior to the meeting date. 本文件應在會議前由供應商填寫完成并提交給SQE。 |DATE | | |PROJECT/PROGRAM | | |日期 | | |項目名稱 | | | | | |SUPPLIER | | | | | |供應商 | | |PART NO | | | | | |零件號 | | | | | |MANUFACTURING | | |LOCATION | | |制造場所 | | | | | |PART | | |DESCRIPTION零 | | |件描述 | | | | | | | | | | | | | | Section 1. Customer Requirements 第一部分 顧客要求 1. Does the supplier understand the applications and intended end use of the parts/materials for all customer?  供方是否理解所有顧客的零件 、材料的應用和最終用途? | Yes | No 否|Explain| | |是 | |:理由:| | 2. Does the supplier have the latest information about program timing (example: Drawing release, Prototype – series, Matching, Pilots/MVB, SOP)? Review Program Milestones with supplier 供方是否有關于項目進度的最新信息(如:圖紙發(fā)放,系列樣件,匹配,試生產,開始 正式生產)? 與供方評審項目節(jié)點。 | Yes | No 否|Explain| | |是 | |:理由:| | |Key Project Milestones |Dates |Key Project Milestones |Dates | |關鍵項目節(jié)點 |日期 |關鍵項目節(jié)點 |日期 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | 3. Does the supplier have and understand the QS-9000 or TS16949 Manual, FMEA Manual,SPC Manual, Measurement Systems Analysis Manual, Quality System Analysis Manual, PPAP Manual and the Advanced Product Quality Planning (APQP) and Control Plan Manual? 供方是否有并理解QS-9000或TS16949,F(xiàn)MEA,SPC,MSA,QSA,PP AP,APQP和控制計劃手冊? | Yes | No 否|Explain| | |是 | |:理由:| | 4. Has the supplier provided all information listed in the Required Quality Information letter as outlined in the RFQ package? 供方是否提供RFQ文件包中的“要求的質量信息”清單中列出的所有信息? | Yes | No 否|Explain| | |是 | |:理由:| | 5. Does the supplier have and understand all the requirements listed in the Supplier Quality Statement of Requirements GM1927- 3供應商是否有并理解“供應商質量要求申明”(GM1927-3)中的各項要求? | Yes | No 否|Explain| | |是 | |:理由:| | 6. Are returnable containers required? 是否要求重復使用料箱? | Yes | No 否|Explain| | |是 | |:理由:| | 7. Are there any packaging issues to be resolved? 包裝方面的問題是否已解決? | Yes | No 否|Explain| | |是 | |:理由:| | | | | | | 8. Does supplier agree to provide product in clean dunnage/containers? 供方是否能用清潔的隔板、料箱放置產品? | Yes | No 否|Explain| | |是 | |:理由:| | | | | | | | | | | | Section 2. Product Design / Development 第二部分 產品設計、開發(fā) 9. Does the supplier have ALL of the latest drawings and specifications (SOR, SSTS, CTS, STD)? 供應商是否有所有的最新圖紙和技術規(guī)范(要求聲明,分系統(tǒng)技術要求,零件技術要求 ,標準)? | Yes | No 否|Explain plans to| | |是 | |obtain: 說明獲 | | | | |取計劃: | | | | | | | | | | | | | | | | | | | | | | | | | | | 10. Has an Analysis Development Validation (ADV) plan been provided if specified in the SOR? 如SOR中要求,是否提供了分析開發(fā)驗證計劃(ADV)? | Yes | No 否|Specify planned | | |是 | |date: | | | | |說明計劃日期: | | 11. If communication link for math data exchange is needed have appropriate contacts been taken? 如果需要進行數(shù)模信息的交換,是否建立了相關的溝通渠道? | Yes | No 否|Explain| | |是 | |:理由:| | 12. If GM is design responsible, has a Design-FMEA review been done between supplier and the GM Engineer? 如果通用負責設計,供方是否和通用工程師一起進行了設計FMEA的評審? | Yes | No 否|Specify planned | | |是 | |date: | | | | |指定計劃日期: | | 13. If Supplier is design responsible, has a Design-FMEA been done? Are actions in place to reduce high RPNs? Has a review with the GM engineer been completed? 如果供應商負責設計,是否進行了DFMEA?是否采取措施以降低高RPN?是否 與通用工程師一起進行了相關評審? | Yes | No 否|Specify planned | | |是 | |dates: | | | | |指定計劃日期: | | 14. If supplier is responsible for system, has a system FMEA been completed and been reviewed? 如果供應商負責系統(tǒng)開發(fā)、生產,是否已完成系統(tǒng)FMEA 并進行了評審? | Yes | No 否|Specify planned | | |是 | |dates: | | | | |指定計劃日期: | | 15. Has a design review been done by the supplier and reviewed with the GM product engineer? 供應商是否進行了設計評審并與通用產品工程師一起進行評審? | Yes | No 否|If No , | | |是 | |explain: | | | | |如為否,原因: | | If yes, has design review been approved by engineering and drawings/specifications revised as appr...
APQP?T"穎?doc)
 

[下載聲明]
1.本站的所有資料均為資料作者提供和網(wǎng)友推薦收集整理而來,僅供學習和研究交流使用。如有侵犯到您版權的,請來電指出,本站將立即改正。電話:010-82593357。
2、訪問管理資源網(wǎng)的用戶必須明白,本站對提供下載的學習資料等不擁有任何權利,版權歸該下載資源的合法擁有者所有。
3、本站保證站內提供的所有可下載資源都是按“原樣”提供,本站未做過任何改動;但本網(wǎng)站不保證本站提供的下載資源的準確性、安全性和完整性;同時本網(wǎng)站也不承擔用戶因使用這些下載資源對自己和他人造成任何形式的損失或傷害。
4、未經(jīng)本網(wǎng)站的明確許可,任何人不得大量鏈接本站下載資源;不得復制或仿造本網(wǎng)站。本網(wǎng)站對其自行開發(fā)的或和他人共同開發(fā)的所有內容、技術手段和服務擁有全部知識產權,任何人不得侵害或破壞,也不得擅自使用。

 我要上傳資料,請點我!
人才招聘 免責聲明 常見問題 廣告服務 聯(lián)系方式 隱私保護 積分規(guī)則 關于我們 登陸幫助 友情鏈接
COPYRIGT @ 2001-2018 HTTP://musicmediasoft.com INC. ALL RIGHTS RESERVED. 管理資源網(wǎng) 版權所有